PreCrusher High Vol Case StudyChallenge:

Provide a Compaction Solution for Large Volume Bulky Waste Stream requiring High Ram Force for Size Reduction while increasing volume per haul for a Major Manufacturer Parts Distribution Facility.

Solution:

National Equipment Solutions proposed and installed a Unique Pre-Crusher Application to reduce the Volume of Wood crates and pallets prior to compacting. The Pre-Crusher reduces in the volume of the waste stream substantially through High Ram Force Pre Crushing. After the Pre-Crushing cycle, the machine compacts the waste into a collection container useing high force increasing the tons per haul and reducing the number of hauls making the entire system efficient and cost effective.

This unit was installed in a pit inside the building while the collection container remains outside the building. All material is loaded by forklift at floor level inside.